
We began our crossing at 9:30 pm from the Caribbean side, entering the first of the three Gatun Locks.

We completed the transit the following day exiting through the three Miraflores Locks.

Ben, our engineer, navigating through the locks

Pacific Ocean here we come!

Steve and Brigit Otero with Wendy and Larry (who was cooling everyone off with the hose in hand!)
No comments:
Post a Comment